Nursery school Skogsgläntan in Kil
In Kil, a modern nursery school is being built with a firm focus on the children and the environment. The buildings will be heated largely using heat generated by people and equipment. A waterbased underfloor heating system has been connected to the district heating system to ensure that the building is also kept warm during colder periods.
The new nursery will have six departments and will be opened in September 2010.
Construction client:
Kils Kommun
Architect:
Sweco Arkitekter
Structural engineer:
NCC
Electrical Entrepreneur:
EKG/Elinstallatören
Ventilation system:
Grontmij/Wermvent
Finish:
september 2010




